Services to Projects

Consultancy Provided for various Solar Parks

CVK Solar Enterprises Pvt. Ltd is providing Consultancy Services to M/s Green Grid, Jodhpur for setting up of their 50 MW Solar Park in Barmer District of Rajasthan.

Completed Services

  • Checking of Power Evacuation Feasibility at various RVPN 132 kV GSSs.
  • Checking of suitability of Identified Lands for 50 MW Solar Park.
  • Registration of 50 MW Solar Park with RRECL at one location and its amendment to new location in Barmer region.
  • Preparation of first Detailed Project Report for Registered Location and thereafter for revised location second DPR for 50 MW Solar Park.
  • Preparation of Power Evacuation / Connectivity Proposals for 50MW Solar Park for registered location and then for revised location of RVPN GSS.
  • Arranging of deposit of cost of 132kV Bay to RVPN Authorities.
  • Arranging of Power Evacuation/Connectivity Approval from RVPN for revised location of 50MW Solar Park in Barmer Region.
  • Follow ups and meeting with Top / Senior Level officers in RRECL, RVPN and other Govt Departments for timely completion of Registration and Connectivity approval.
  • Appropriate Replies/Clarifications / Support to all queries raised by RRECL, RVPNL and Other Govt Agencies for smooth clearances in the process of Registration and Connectivity Approvals.
  • Support and guidance in Design and Planning of Solar Park.
  • Estimation of Cost of Pooling Station.
  • Estimation of Open Access charges and Losses for energy generated from Captive Solar plants installed in 50 MW Solar Park and its use at consumer end.
  • Preparation of Progress Reports periodically for submission to different Departments.
  • Replies/Clarifications /support to all queries raised by Green Grid team and providing requisite details related to Setting up of solar plants in solar park and while completion of above services.

Ongoing Services:

  • Arranging of submission of BG against utilisation of 132 kV Bay to start construction activity of 132 kV Bay in RVPN GSS by RVPN Authorities.
  • Perusing RVPN Authorities for timely readiness of 132 kV Bay in RVPN GSS.
  • Support in Procurement & EPC order of 132 kV Pooling Station.
  • Support in Procurement & EPC order of 132 kV Transmission Line.
  • Supervision of works of 132 kV Pooling Station in 50 MW Solar Park &132 kV Transmission Line.
  • Preparation of Proposals for Registration and various Approvals from RREC, RVPN and Other Agencies and arranging their approvals for setting up of Solar plants in Solar Park including follow ups and meetings.
  • Support in Preparation of Financial Proposals of Captive Solar Plants in Solar Park.

CVK Solar Enterprises Pvt. Ltd is providing Consultancy Services to M/s Girirajji Green Power Pvt. Ltd. Udaipur for their 30 MW Solar Park in Jalore District of Rajasthan.

Completed Services

    • Checking of Power Evacuation Feasibility at RVPN 132 kV GSS.
    • Checking of suitability of Identified Land for Solar Park.
    • Preparation of Detailed Project Report for 20 MW Solar Park.
    • Preparation of Power Evacuation Proposal for 15 MW Solar Park.
    • Registration of 20 MW Solar Park (Phase-1) with RRECL.
    • Arranging of Power Evacuation/Connectivity Approval from RVPN for 15 MW (Phase-1).
    • Arranging of deposit of cost of 33 kV Bay to RVPN Authorities.
    • Arranging of Capacity Enhancement by 10 MW in existing 20 MW Solar Park from RRECL.
    • Proposal for combined Power Evacuation of 30 MW (15MW + 15MW existing) Solar Park.
    • Arranging of deposit of cost of 2nd 33kV Bay to RVPN Authorities.
    • Arranging of Power Evacuation/Connectivity Approval from RVPN for 30 MW (15 MW already approved).
    • Follow ups and meeting with Top / Senior Level officers in RRECL, RVPN and other Govt Departments for timely completion of Registration and Connectivity approval.
    • Appropriate Replies/Clarifications / Support to all queries raised by RRECL, RVPNL and Other Govt Agencies for smooth clearances in the process of Registration and Connectivity Approvals.
    • Estimation of Open Access charges and Losses for energy generated from Captive Solar plants installed in 50 MW Solar Park & its use at consumer end
    • Preparation of Progress Reports periodically for Submission to various Govt Departments.
    • Replies/Clarifications /support to all queries raised by Girirajji team and providing requisite details related to Setting up of Solar Plants in the Solar Park.

Ongoing Services:

    • Arranging of submission of BG against utilisation of Bays to start construction activity of 33 kV Bays in RVPN GSS.
    • Perusing RVPN Authorities for timely readiness of 33kV Bays in RVPN GSS.
    • Preparation of Proposals for Registration and various Approvals from RREC, RVPN and Other Agencies and arranging their approvals for setting up of Solar plants in Solar Park including follow ups and meetings
    • Open Access Agreements with requisite agencies for energy utilization of Solar Plants to consumer end & billing adjustment.

On award by RSMML, CVK Solar Enterprises Pvt. Ltd. completed the work of “Consultancy Services for Detailed Project Report Preparation for development of Solar power plants at various land available in and around the RSMML mines at different locations in Jaisalmer, Gotan, Nagaur, Jalore, Bikaner, Barmer, Udaipur etc. and land available at wind farms installed in Jaisalmer, Rajasthan”. 

Completed Services

  • CVK Teams visited the RSMML owned Mines Land Sites for possible use in the development of Solar Plant.
  • CVK Teams visited the RVPN GSS nearby to respective RSMML owned Mines Sites.
  • Checked suitability of Mines Site land for Solar Plant,
  • Checked Solar Irradiation level and estimation of Solar energy generation from Solar plants if setup on available RSMML Mines sites.
  • Feasibility of Power Evacuation/ Connectivity from proposed Solar Plants at the RSMML Mines sites to nearby STU/CTU GSS.
  • Technical & financial viability of Solar Plant at RSMML Mines sites and Other owned land.
  • Arranging Draft of Suitable PPA/WBA for Sale of Power generated.
  • Submitted Site Visit report to RSMML.
  • Suggestion of various proposals for creation of 1000-2000MW Ultra Mega Solar Parks on RSMML Owned Mine Sites.
  • Possible support from MNRE for development of Ultra-Mega Solar Parks.
  • Submitted Draft Detailed Project Report.to RSMML.
  • Submitted Final Detailed Project Report.to RSMML along with Recommendation.

Consultancy Provided To Captive Solar Projects

CVK Solar Enterprises Pvt. Ltd was associated with L&T and provided consultancy to  two Solar Captive PV projects of Hindustan Zinc of capacity 12 MW and 4 MW which have been commissioned well in time.  CVK Team acted very fast and arranged following in view of our liaison services

  • Analysis of Power flow from Grid, Consumption by Hindustan Zinc Plant
  • Open Access rules, charges applicable of solar energy for captive use.
  • Analysis of Grid of RVPN , its inter connection lines and Grid of Hindustan Zinc and
  • Metering Interconnection and clearance from Discom for solar plant regarding flow of power and stability of system.
  • Preparation of Detailed Project Report of Captive Projects and its submission to RREC for Registration of Projects.
  • Clearance from CEIG of complete Solar projects.
  • Connectivity approvals from RVPNL
  • Approval from SLSC for creation of connectivity cum commissioning team by RREC for captive plants like HZL first time (when Raj. Urja Vikas Nigam refused to issue orders for committees since HZL project was Captive).
  • We have guided L&T team on critical issues of Metering system and their calibration, Power evacuation scheme feasibility, Equipment to be completed for CEIG approval and completion of metering system and connectivity to system etc.
  • CVK team ensured that L&T synchronised these Solar Projects on 25th March and 26th March 2017 respectively even against very tight schedules and holidays. This was an achievement not only for us but L&T. HZL has very much appreciated our services.

2 MW Captive Solar plant at Wonder Cement was completed by L&T team in February 2017. This project was facing problem of commissioning whose consultancy work was assigned to some local consultant. On failure of Local Consultant, CVK team as an exceptional technical support and consultancy helped L&T to complete synchronising of 2 MW solar plant on 27th March 2017 in a very short period of 2 days.

CVK Solar Enterprises was associated with L&T for Consultancy for earlier 4 projects of total capacity of 17 MW which have been commissioned well in time. L&T Team Land clearance took longer time then expected (3rd week of March 2013) but CVK Team acted very fast and we arranged commissioning well in time in view of our liaison services

  • Arranged Common Power Evacuation approval first time of four solar projects in India.
  • Metering approval of 4 Projects at one location first time.
  • Connectivity approval from RVPNL for Four projects first time.
  • Arranged creation of connectivity cum commissioning teams from RDPPC for all the four REC Projects at first time.
  • We have guided L&T team on critical issues of
  • Metering system and their calibration
  • Open Access rules applicable of solar energy for captive use.
  • Power evacuation scheme feasibility
  • PTCC clearance for 132 kV line (charged at 33 kV)
  • Equipment to be completed for CEIG approval and completion of metering system and connectivity to system etc.

Hindustan Petroleum Corporation Ltd (Govt. of India PSU), for the development of 350 kW grid interacted solar projects / Mini grids for PMC work as Owners Engineer of HPCL from feasibility, Load analysis, Solar radiation and Estimation of solar Generation by PV SYST,  Detailed  Project Report, selection of Sites for Roof Top plant in Depot Building and Ground area, Power Evacuation planning and integration with Existing System, Preparation and issue of e-Bid Document, Bid analysis, selection of EPC Player, drafting of Contract Agreement and O& M Agreement,  Approval of Drawings, Review of Design, Supervision during Erection, Commissioning Checks, Completion/handing over of Project & assistant  during O&M, Review of Generation and O&M activity.

Consultancy under Execution for Various Captive Solar Projects

Presently CVK Solar Enterprises Pvt. Ltd is associated with L&T for following liaison services/ Consultancy for 54.4 MW DC Captive solar projects of Hindustan Zinc Ltd. 

Completed Works –

  • Analysis of Power flow from Grid, Consumption by Hindustan Zinc Plant
  • Analysis of Grid of RVPN , its inter connection lines and Grid of Hindustan Zinc and
  • Metering Interconnection and clearance from Discom for solar plant regarding flow of power and stability of system.
    • Estimation of land for solar plant.
    • Study of Solar Radiation of site and Estimation of solar energy From PV SYST
    • Preparation of Detailed Project Report of Captive Project.
    • Power evacuation scheme feasibility
    • Connectivity approval from RVPNL

      Under Process (delayed due to land purchase by L&T)

    • Approval from SLSC
    • Approval from SLEC
    • Clearance from CEIG
    • Approval of Metering system
    • Connectivity
    •  

    We could have completed some more activities but Land procurement process is taking some extra time by Land Aggregator of L&T. But once land procurement by L&T is over we will complete other activities to so that L&T project is completed in Time. 

CVK Solar Enterprises Pvt. Ltd was awarded Technical Consultancy and PMC Services for Setting up of Captive 10 MW Solar Power Project by Jodhpur Municipal Corporation.

Completed:-       

  • Detailed project Report of 10 MW Solar plant :-CVK Solar under Leader Ship of M M Vijayvergia has already provided consultancy to Jodhpur Municipal Corporation for feasibility & Planning Report of 10 MW Solar Power Plant Estimation of land for solar plant, Study of Solar Radiation of site and Estimation of solar energy From PV SYST and   submitted Detailed  Project Report of 10 MW Solar Plant at Keru Yard Area, Jodhpur along with planning of integration of 33 kV Power Evacuation transmission System with nearby 220/132 /33 kV RVPNL GSS at Badli, Jodhpur.

 Bid document of 10 MW Solar plant :- CVK Solar team has prepared Bid document for Best selected financial model  and submitted the Bid document for 10 MW Solar plant under CPSU Phase-II Scheme annuity mode for its issue by Jodhpur Municipal Corporation along with Contract cum Annuity Agreement, O&M agreement for 25 Years. 

I) 120KW SOLAR POWER PLANT

CVK Solar under Leader Ship of M M Vijayvergia has provided consultancy to HPCL for their projects of 120 KW roof top plants for feasibility, Planning of 120kW Solar Power Plant and submitted final Project report along with planning of integration of Power Evacuation transmission System with state Grid, at Paradeep for 120 KW. Bid document under Net Metering System submitted and HPCL issued Bid Document for 120 kW. Analysis of Bids Completed and submitted to HPCL.

As per contract CVK Solar team will provide PMC consultancy to HPCL in respect of:- 

  1. Preparation of Bid Documents , pre-Bid meeting , analysis of Bids  for 120 kW ,
  2. Selection of Solar power Developer  for 120 kW solar plants
  • Supervision of Erection work, Inspection of Material and commissioning Checks as owners Engineer for HPCL projects of 120 KW and 400 kW roof top plants.

    II) 400KW SOLAR POWER PLANT

CVK Solar under Leader Ship of M M Vijayvergia has provided consultancy to HPCL for their projects of 400 kW roof top plants for feasibility, Planning of 400 kW Solar Power Plant and submitted final Project report along with planning of integration of Power Evacuation transmission System with state Grid, 400 kW at Bokaro. Bid document under Net Metering System submitted to HPCL for 400 kW. Analysis of Bids Completed and submitted to HPCL.

As per contract CVK Solar team will provide PMC consultancy to HPCL in respect of :- 

  1. Preparation of Bid Documents , pre-Bid meeting , analysis of Bids  for 400 kW,
  2. Selection of Solar power Developer  for 400 kW solar plants
  • Supervision of Erection work, Inspection of Material and commissioning Checks as owners Engineer for HPCL projects of 400 kW roof top plants.

Registration for Solar Plant with Govt. Agencies

CVK Solar Enterprises Pvt. Ltd is Registered Company for PMC Services for

  1. Central Electronics Ltd
  2. Hindustan Petroleum Corporation Ltd.
  3. Bharat Petroleum Corporation Ltd.
  4. CVK Solar Enterprises Pvt. Ltd is Channel Partner of Ministry of New and Renewable Energy (GOI).
  5. CVK Solar Enterprises Pvt. ltd is registered with MSME.

Services Already Made

Project Management Consultancy

  • Feasibility Reports
  • Project Reports
  • Registration & Approvals
  • Checking of design, drawings &Monitoring
  • Supervision of works
  • Commissioning and Completion Documents 

Power Evacuation from Solar plants

  • STU Substation locations
  • Transmission lines
  • Substation in Solar Plant
  • Voltage, Line length,
  • Plant locations
  • Future Planning

Solar Park

  • Capacity of Solar Parks
  • Land Selection
  • Power Evacuation Requirements
  • Location of Substations
  • Substations in Solar parks

Open Access of Energy from Solar plant

  • Captive Use of Energy from Solar Plant
  • Sale of energy to Third Party from Solar plant
  • Transmission of Energy in STU lines
  • Wheeling of Energy in Discom lines
  • Banking of energy
  • Incentives Available
Address:

203-204, Okay Plus Tower, Near Vishal Mega Mart, Opp. Government Hostel, Jaipur-302001 (Rajasthan) INDIA.

(+91) 141 2365505 / +91-9982044488 / +91-9950611113,15 / 7340024336,38

info@cvksolar.in

Copyrights © 2021 Cvksolar | Designed & Developed By Zauca